Communal Gardens
24th June 2022
Our service engineers were called out to a contacted communal garden in central London this week to repair the system which had been reported to not be functioning correctly. This was all the more urgent due to the mini heat wave being experienced across the UK, with the lawns and flower bed bearing the brunt of the heat. Upon investigation, our engineer discovered there to be an issue with the rain sensor not linking to the controller along with damaged sprinkler bodies which could be easily replaced. Our engineer reset the runtimes of the system and increased the watering schedule to combat the intense heat and dry spell being experienced.
Back to News