TCR called in to install a new pump.
7th February 2014
TCR were called in by an existing client to replace a pump at a location in South Cheshire. TCR had not installed the original pump and on investigation it was found that the client’s current pump was 80% larger than it needed to be. The new pump requirement was assessed and a pump installed that was more suitable and cost effective for the client. Once again TCR offer the best and most cost effective solution for the job. We are always happy when we can assist existing and new clients to get the best out of their irrigation system.
Back to Installation News